Platform Remedial Works - Rosewood, Queensland

Client: Queensland Rail
Main Contractor: Australian Marine & Civil

Project Specification: The station in Rosewood was built in the 1960s and the west side of the Down Main platform was suffering from subsidence up to 200mm. A permanent anchoring solution was required to stabilize the 1.5m high platform wall with a Working Load of 11kN per anchor specified.

Solution: Platipus B4 anchors were installed at 1m centres through 200mm diameter core holes cut in the platform walls. Each anchor was driven to 6m, loadlocked and then Proof Loaded to 20kN. Cirtex Australia provided on-site advice ensuring the installation was completed with the allotted 12 hour track possession.

http://www.platipus.com.au/uploads/images/case-studies/large/rosewood_platform_remedial_works_queensland.jpg

For more information regarding our products and applications, visit our main site

Visit the Platipus main site

Download Case Studies

 
Download our other case studies:
 
 
 
 
 
 
 
 
 
 

We value your interest in our products and our policy is NOT to send you unwanted / unnecessary SPAM. However if you would occasionally like to receive interesting and relevant information relating to this area, once or twice a year, please tick Yes:

 
 

Fields marked with * are compulsory.